My sincerest apologies if this has been brought up, and please just ignore this if it has (Everyone tends to be rough on the new guy!), but it looks like the new track in the project area shows signs of being used?
The reason I ask is because I've watched many specials regarding coaster technology and know that they are all built to exacting specs and somewhat assembled to ensure everything is perfect. However, I've never known a manufacturer that has built the entire coaster and tested it before shipping.
Is this possible, and if so, was it due to the extreme nature of this new design or the history of problems with new Intamin technology at CP?